Breaking
FHWA Buy America Final Rule Published (23 CFR 635.410)
FHWAregulationmanufactured_productsiron_steelconstruction_materialsphase_1phase_2
FHWA publishes the final rule for Buy America requirements for federal-aid highway construction (23 CFR 635.410). Establishes the two-phase manufactured products requirement, de minimis thresholds, and waiver procedures. Phase 1 effective October 1, 2025; Phase 2 effective October 1, 2026.
Read the full document at Federal Register →